Manufacturing Readiness Before an RFQ

2025-01-15

A strong RFQ starts with enough technical context to assess process, risk, and lead time.

An RFQ is not only a price request. It is the first test of whether the technical package can be executed consistently.

Include intended use, quantities, drawings, material requirements, and the acceptance criteria that matter most.